|
|
![]()
Interchanges: This new module to
implement the recently approved
procedures in the HCM Chapter 26 for Interchange Ramp Terminals. The new methodology
covers the analysis of eight interchange
types, including, Diamond Interchange
(CUDI, CDI, TUDI); Partial Cloverleaf A – 4 Quadrants (Parclo A 4Q);
Partial
Cloverleaf A – 2 Quadrants (Parclo A 2Q); Partial Cloverleaf B – 4
Quadrants
(Parclo B 4Q); Partial Cloverleaf B – 2 Quadrants (Parclo B 2Q);
Partial
Cloverleaf AB – 2 Quadrants (Parclo AB 2Q); and Partial Cloverleaf AB –
4
Quadrants (Parclo AB 4Q), with Single-Point Urban
Interchange (SPUI) to be added this year;
The analysis is based on the procedures for signalized intersections, but adds several components to account for the unique relationship between signals controlling the ramps at interchanges.
The measures of
effectiveness are computed for the various
origin-destination (O-D) pairs to completely describe operations
through both
intersections. Level of Service (LOS) is
provided for each O-D and is based on control delay in seconds per
vehicle
(like in Signalized Intersections), but with modified LOS thresholds to
account
for the vehicle traveling through two intersections.
There are also two additional provisions for
LOS F. If either the volume-to-capacity
ratio or the queue storage ratio exceeds 1.0, the LOS is F.
HCS+Interchanges
files can be imported into
TRANSYT-7F for generatiing TSIS-CORSIM* files for one-touch animation. TRANSYT-7F: TRANSYT-7F is now integrated
with HCS+ Catalog: Click here for pricing, a complete description and to order.HCS+T7F is an office license with agency licenses available. Discounts are available for qualified academic purchases.
|
|||||